Tier 4 Final Powertrains
EPA / EU Stage V diesel packages with DPF/SCR maps validated on ISO 8178 C1 cycles for long boom duty.
Bridge erection, plant outages and industrial tandem lifts — sized by SWL at radius, boom/jib geometry and ground bearing pressure, then commissioned with ASME B30 documentation.
Side-by-side parameters procurement and lift planners use when choosing between a mid-class crawler and a heavy-lift lattice package for the same jobsite pad.
| Parameter | M-220 Lattice Crawler | M-650 Heavy Lift |
|---|---|---|
| Rated capacity class | 220 t | 650 t |
| SWL @ 24 m radius | 86 t | 214 t |
| Main boom max | 84 m | 108 m |
| Fixed jib option | 18–36 m | 24–48 m |
| Engine | 298 kW Tier 4 Final | 447 kW Tier 4 Final |
| Ground bearing (std mats) | 1.8 kg/cm² | 2.4 kg/cm² |
| Counterweight kits | 4 modular packs | 7 modular packs |
| LMI / ATB | Standard | Standard + dual-winch interlock |
EPA / EU Stage V diesel packages with DPF/SCR maps validated on ISO 8178 C1 cycles for long boom duty.
Factory fill targets 18/16/13 cleanliness with sample ports on main pumps and hoist circuits.
ASME B30.5 / AS 2550 pin gauges, anti-two-block function tests and slew-bearing torque audits.
Track shoes, idlers and rollers scheduled before pad settlement or travel delays hit the critical path.
Hoist rope, sheaves and pin kits staged for mean-time-to-repair under 18 hours on contracted lifts.
ISO 6395 cab noise under 75 dB with integrated load-moment indicator and 360° camera package.
Load charts, emissions samples and inspection checklists lift planners attach to tender responses.
22 regional parts hubs · under 18 h MTTR · ASME B30 / AS 2550 re-certification team on call.