Manitowoc lattice boom crawler crane on bridge erection site

Manitowoc Crane Platforms for Crawler & Lattice Boom Heavy Lifts

Bridge erection, plant outages and industrial tandem lifts — sized by SWL at radius, boom/jib geometry and ground bearing pressure, then commissioned with ASME B30 documentation.

Lattice Boom Crawler — Mid vs Heavy Class Compare

Side-by-side parameters procurement and lift planners use when choosing between a mid-class crawler and a heavy-lift lattice package for the same jobsite pad.

ParameterM-220 Lattice CrawlerM-650 Heavy Lift
Rated capacity class220 t650 t
SWL @ 24 m radius86 t214 t
Main boom max84 m108 m
Fixed jib option18–36 m24–48 m
Engine298 kW Tier 4 Final447 kW Tier 4 Final
Ground bearing (std mats)1.8 kg/cm²2.4 kg/cm²
Counterweight kits4 modular packs7 modular packs
LMI / ATBStandardStandard + dual-winch interlock

Engineering Signals Lift Planners Verify First

Tier 4 Final Powertrains

EPA / EU Stage V diesel packages with DPF/SCR maps validated on ISO 8178 C1 cycles for long boom duty.

ISO 4406 Hydraulics

Factory fill targets 18/16/13 cleanliness with sample ports on main pumps and hoist circuits.

Annual Load Chart Re-cert

ASME B30.5 / AS 2550 pin gauges, anti-two-block function tests and slew-bearing torque audits.

8,000 h Undercarriage Cycle

Track shoes, idlers and rollers scheduled before pad settlement or travel delays hit the critical path.

22 Regional Parts Hubs

Hoist rope, sheaves and pin kits staged for mean-time-to-repair under 18 hours on contracted lifts.

ROPS Cab + LMI Suite

ISO 6395 cab noise under 75 dB with integrated load-moment indicator and 360° camera package.

108 mMax main boom length
650 tHeavy-lift crawler SWL class
2,800Annual crane units capacity
120Countries with field support

Procurement & Service Questions

Procurement & Logistics

Typical PO-to-pad lead time for a crawler crane?
Standard mid-class crawlers ship in 14–18 weeks ex-works; heavy-lift lattice packages with custom counterweight kits average 20–26 weeks including witness testing.
Which Incoterms do you support for overseas lifts?
FOB at primary export ports is standard; CIF/DAP consolidation is available when boom sections, mats and counterweights travel as a matched set.
What compliance packs ship with each unit?
CE 2006/42/EC DoC, EPA Tier 4 Final engine files, ISO 9001 factory certificate and ASME B30 load chart binders with radius tables.

Service & Spare Parts

How fast can field service reach a contracted jobsite?
Contracted sites target under 18 hours mean-time-to-repair through 22 regional hubs stocking hoist rope, pins and LMI sensors.
What is the undercarriage rebuild interval?
Track groups are planned at 8,000 operating hours with wear surveys every 1,000 hours on abrasive pads.
Do you re-certify boom load charts on site?
Yes — annual ASME B30 / AS 2550 audits cover pin gauges, ATB, slew torque and LMI calibration with signed reports for the EOR.

Engineering Downloads

Load charts, emissions samples and inspection checklists lift planners attach to tender responses.

PDF

220 t Crawler Load Chart

PDF · 4.6 MBRequest
PDF

650 t Lattice Capacity Curve

PDF · 3.1 MBRequest
PDF

Tier 4 Final Emissions Sample

PDF · 2.0 MBRequest
XLSX

Undercarriage Wear Survey

XLSX · 0.4 MBRequest
PDF

ASME B30 Re-cert Checklist

PDF · 1.8 MBRequest
PDF

ISO 4406 Sampling SOP

PDF · 1.1 MBRequest

Ready to Quote Your Next Crawler Class?

22 regional parts hubs · under 18 h MTTR · ASME B30 / AS 2550 re-certification team on call.