Connected Fleet Service

From Hours-since-Last-Service to Predicted Slew Wear in 37 Hours

Telematics, predictive parts dispatch and Tier 4 field retrofit programs sized for Manitowoc crawler crane fleets on bridge, plant and wind sites. CAN-bus streams feed your lift office every 30 seconds so planners see rope hours, hydraulic cleanliness and undercarriage shoe life before a critical pick.

Innovation engineering pairs ISO 15143-3 AEMP feeds with regional hub inventory so pin kits and LMI sensors leave the nearest warehouse before the alarm window closes. Electrified retrofit pilots keep Tier 4 platforms productive while sites trial lower-emission duty cycles on short-radius industrial pads.

Service Pillars for Crane Uptime

Telematics-driven PM

CAN-bus plus ISO 15143-3 AEMP feeds stream hoist hours, boom angle duty and engine load factor to the fleet office every 30 seconds. Planned maintenance tickets open automatically when rope or sheave thresholds approach the ASME B30 inspection window.

AI Predictive Parts

Slew-bearing wear, hydraulic ISO cleanliness and track shoe life project roughly 37 hours ahead. Parts auto-dispatch from the nearest quarry-belt hub so tandem lift weekends are not lost to overnight freight.

Tier 4 Field Retrofit

Stage V / Tier 4 Final DPF-SCR health packages, regenerative slew brake audits and emissions documentation packs keep crawler fleets compliant on regulated urban corridors and petrochemical sites.

Assisted Lift Pilot

Geofenced assisted-travel and camera-assisted tandem protocols for industrial pads — Level-4 haul concepts adapted to crawler travel paths, not open-pit trucks.

37hAverage advance warning before unplanned crane downtime
28%Idle fuel cut on monitored lattice boom fleets
6.2×Longer slew-bearing interval after grease-cycle tuning
18Active assisted-lift / telematics pilots on heavy sites

Service scope boundaries

Telematics and predictive dispatch assume continuous CAN-bus / ISO 15143-3 connectivity; sites with intermittent cellular coverage fall back to scheduled ASME B30 inspections rather than 37-hour predictive windows. Assisted-travel pilots are limited to geofenced industrial pads — they are not open-road autonomy. Field retrofit packages cover documented Tier 4 Final / Stage V health items; structural boom modifications outside the original chart remain engineering change-orders, not overnight spare-parts jobs.

Night industrial plant with crawler crane floodlights

Co-design the next connected lift program with Manitowoc engineering.

Share your fleet serials, duty cycles and pad constraints — we return a telematics and parts rider within five business days.

Required
Required
Valid email required
Required
Required
Describe the lift class and radius